人人爽人人澡人人高潮_亚洲国产中文在线二区三区免_久久精品无码一区二区无码_国产精品亚洲lv粉色

Hello, welcome to visit the official website of Quzhou Wentian Chemical Co., Ltd.
Service Tel: +86-570-3083319 中文English

PRODUCTS

+ High Molecular Fluoropolymer Self-adhesive Coiled Material+ Fluorocarbon anti-corrosion coating series+ Fluorocarbon building exterior wall waterproof decorative coating+ Fluorosilicone Nano Bamboo Wood Anticorrosive Coating
Anti-rust and anti-corrosion coating integrated on the bottom surface


Product introduction: This product is made of high-molecular polymer resin, BYK and other excellent additives to form a coating. It is a two-component reactive coating with Bayer curing agent to form a film. It can effectively prevent the damage of the base surface by the atmospheric environment and prolong the service life of the coated object.

Scope of application: all kinds of machinery industry products and steel structure industry products

Features: There is no need to polish and remove rust, and there is no need to brush the primer on the surface of the steel body, just spray the paint product once to form a film. And the paint film is full and bright, with strong anti-rust ability and strong adhesion. It is suitable for metal products in various machinery industries. cost.

Construction method: deployment in strict proportion. First mix the curing agent and the paint thoroughly and cure for 15 minutes, then add the thinner. In the production process of this product, special consideration is given to the construction requirements, so it can be painted by brushing, spraying and rolling. This product is a two-component reactive coating, which should be used within 4 hours after mixing.

Drying time: temperature 25 ℃, surface dry 30 minutes, hard dry 24 hours. Fully cured for 5-7 days.

Coating interval: more than 4 hours.

Storage: Cap tightly sealed. Store in a cool, clean, dry place. The shelf life is 2 years.

Surface treatment: remove floating rust and welding slag spatter on the surface of the workpiece, and carry out dust and oil removal.

Construction conditions: The humidity during construction is less than 75%, and the construction temperature is 5°C-40°C. Construction is strictly prohibited in rainy, snowy and foggy weather.

Safety and Precautions: Ensure that the construction site has good ventilation. Keep away from open flames, no smoking at the construction site, and avoid paint splashing on eyes and skin.

Supporting primer: no

 

 

  
Contact us
Dazhou Town Industrial Zone, Qujiang District, Quzhou City
Tel: + 86 570 3071 340
Mobile phone: + 86 133 6201 6666
E-mail: wentian@163.com
Mobile
Copyright(C)2023, All Rights Reserved. Supported by