人人爽人人澡人人高潮_亚洲国产中文在线二区三区免_久久精品无码一区二区无码_国产精品亚洲lv粉色

Hello, welcome to visit the official website of Quzhou Wentian Chemical Co., Ltd.
Service Tel: +86-570-3083319 中文English

PRODUCTS

+ High Molecular Fluoropolymer Self-adhesive Coiled Material+ Fluorocarbon anti-corrosion coating series+ Fluorocarbon building exterior wall waterproof decorative coating+ Fluorosilicone Nano Bamboo Wood Anticorrosive Coating
Fluorocarbon Steel Structure Anticorrosion Coating

 

Product introduction: This product is made of fluorocarbon resin, high-quality pigments, fillers, BYK and other excellent additives. It is a two-component reactive coating with Bayer curing agent to form a film. It can effectively prevent the base surface from being damaged by various corrosive media and prolong the service life of the coated object.

Uses: It can be widely used in common steel components, bridges, and chemical anticorrosion.

Features: This is a coating product specially developed for the daily anticorrosion maintenance of steel structure workshops and chemical installations, and the protection of urban steel structures. After the coating product is formed into a film, it has better anti-ultraviolet, anti-chemical corrosion, high weather resistance and scratch resistance functions.

Construction method: deployment in strict proportion. First mix the curing agent and the paint thoroughly and cure for 15 minutes, then add the thinner. In the production process of this product, special consideration is given to the construction requirements, so it can be painted by brush, spray or roller. The surface coating is constructed with a special anti-corrosion primer. The general process is one base and two sides or two bases and two sides. This product is a two-component reactive coating, which should be used within 4 hours after mixing.

Drying time: temperature 25 ℃, surface dry 30 minutes, hard dry 24 hours. Fully cured for 5-7 days.

Coating interval: more than 4 hours.

Storage: Cap tightly sealed. Store in a cool, clean, dry place. The shelf life is 2 years.

Surface treatment: remove floating rust and welding slag spatter on the surface of the workpiece, and carry out dust and oil removal.

Construction conditions: The humidity during construction is less than 75%, and the construction temperature is 5°C-40°C. Construction is strictly prohibited in rainy, snowy and foggy weather.

Safety and Precautions: Ensure that the construction site has good ventilation. Keep away from open flames, no smoking at the construction site, and avoid paint splashing on eyes and skin.

Supporting primer: anti-corrosion special primer

 

  
Contact us
Dazhou Town Industrial Zone, Qujiang District, Quzhou City
Tel: + 86 570 3071 340
Mobile phone: + 86 133 6201 6666
E-mail: wentian@163.com
Mobile
Copyright(C)2023, All Rights Reserved. Supported by